One failure, examined against what the drawing and the standard actually required.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
Building & Plumbing Commission
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society A defect investigation is assessed against the approved drawings and engineering for the property, the National Construction Code, the Victorian Guide to Standards and Tolerances 2015 and the relevant Australian Standard for the element in question.
36 checkpoints across 9 areas on a standard Craigieburn defect investigation report. On an established home we inspect what is readily accessible. Where a roof space, subfloor or meter enclosure is locked, obstructed or unsafe, the report says so rather than passing over it.
This page carries no defect grid, and the reason is explained below.
Building and Pest Inspections Building and timber pest together, which is how Craigieburn should be inspected.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 of an established Craigieburn home.
New Construction Stage Inspections Seven checks through a Craigieburn build, each before the work is closed in.
Pre-Handover (PCI) Inspections The final list, taken while the last payment is still yours. Instant online pricing for Craigieburn, or contact the booking team.
A defect report lists many items across a whole property. An investigation takes one failure and establishes what caused it, which is what you need when the other side disputes responsibility rather than the existence of the problem.
It is written so it could be, but the tribunal expects an expert witness report drawn to its practice note, which we prepare as a separate document. Many disputes settle before that point because a clear investigation removes the argument about facts.