Bored pier inspection in Craigieburn

Depth, diameter and cage position, verified while the hole is still open.

  • After boring and cage placement, before any concrete
  • About 1 hour on site
  • Report within 24 hours
Price your Craigieburn inspectionSend the address and what you need.

Fully licensed & accredited

Stage1 of 7
When to bookAfter boring and cage placement, before any concrete
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Craigieburn bored piers inspection

  • Pier positions and spacing against the footing plan
  • Pier diameter checked at the top of each hole
  • Depth against the engineer's design and the soil report
  • Founding material at the base where visible
  • Reinforcement cage size, laps and starter bars
  • Cover to the cage and centralisers
  • Hole cleanliness, spoil and loose material
  • Standing water or seepage before the pour
  • Steel projection into the slab or beam
  • Termite and service penetrations near piers
  • Set-out against the site plan and boundaries
  • Records and photographs for the engineer where required
Why it matters here

Bored piers inspections on Craigieburn builds

Piers appear on Craigieburn lots where the engineering has to reach through fill or a soft layer, which is most common near the Merri Creek and Aitken Creek corridors and on sites with a history of earthworks. Depth is the whole point and it is the one thing that cannot be verified afterwards, so the inspection has to happen between boring and concrete.

What we find at this stage in Craigieburn

  • Pier depth short of the figure on the engineering
  • Cage off centre so cover is uneven
  • Loose spoil or standing water in the base
  • Cage not seated at the bottom of the hole
  • Reinforcement inadequately supported before the pour
Stormwater pipe broken or blocked below ground, Craigieburn
Stormwater pipe broken or blocked below ground
Sample findings

Sample defects found during our bored piers inspections in Craigieburn

Annotated findings from Bored piers inspections on Craigieburn builds. Client addresses withheld.

Extra fixing required, recorded during a frame inspection in Craigieburn
Additional fixing required to floor framing
Nails sticking out, recorded during a frame inspection in Craigieburn
Nails left proud of the framing
Compressed sheet fixings, recorded during a frame inspection in Craigieburn
Compressed sheet fixings requiring attention
Vapour barrier sections missing, recorded during a frame inspection in Craigieburn
Vapour barrier missing in sections

The other stages of a Craigieburn build

  1. Slab pre-pour inspection in Craigieburn2Slab pre-pourThe day before the pour, steel and formwork complete
  2. Frame inspection in Craigieburn3FrameOnce frame and trusses are up and the roof is on, before lining
  3. Lock-up (pre-plaster) inspection in Craigieburn4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  4. Fixing inspection in Craigieburn5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Craigieburn6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Craigieburn7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Craigieburn →

Guides

Construction stage guides for Craigieburn

All guides →

Book a bored piers inspection in Craigieburn

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Craigieburn: common questions

How long does it take?

Under an hour on a standard residential lot, longer where the pier count is high or the site is difficult to move around.

What happens if a pier is short?

The measured depth goes in the report beside the required depth. Proposing the remedy is for the builder and their engineer; our job is to establish the discrepancy while it is still visible.

Do you certify the footing system?

No. We record observations against the engineering. Certifying a footing system is an engineer's function and the report says where one is required.

Does standing water in the bore matter?

It can be, since concrete placed into standing water does not reach its designed strength at the base. Recording it lets it be pumped out before the pour.

How much notice do you need for this one?

As little as a day. Piers are often bored and filled within forty eight hours, so call as soon as the date is set rather than once it is confirmed.

What should I send you?

The engineering drawing for your lot with pier depths, diameters and positions. Without it we can report what is there but not whether it matches what was specified.