Frame inspection in Craigieburn

The structure while every fixing is still countable.

  • Once frame and trusses are up and the roof is on, before lining
  • 1 to 2 hours on site
  • Report within 24 hours
Price your Craigieburn inspectionSend the address and what you need.

Fully licensed & accredited

Stage3 of 7
When to bookOnce frame and trusses are up and the roof is on, before lining
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Craigieburn frame inspection

  • Stud, plate, lintel and beam sizes against AS 1684 and the engineer's drawings
  • Wall straightness and plumb, top plate level
  • Floor level across the slab
  • Bracing type, position and fixing against the bracing plan
  • Tie-downs from roof to wall and wall to slab
  • Triple grips, straps and bolt fixings
  • Jack studs, lintels and trimmers over every opening
  • Window sill trimmers for wide openings
  • Roof truss spacing, fixing and girder connections
  • Valley boards, ceiling battens and roof bracing
  • Window and door openings against the plans
  • Wet area framing, noggings and service penetrations
  • Damaged, split, notched or over-drilled members
  • Termite collars and slab penetrations still visible
Why it matters here

Frame inspections on Craigieburn builds

Craigieburn frame inspections turn up the ordinary consequences of trades working quickly around each other. Floor joists short of fixings on a double storey. Compressed sheet fixings not right at the balcony. Sliding door supports never installed. A meter box out of plumb. Individually none of them stops the build; together they are a list that costs nothing to fix now and becomes somebody else's problem once the plasterer arrives.

What we find at this stage in Craigieburn

  • Floor joists requiring additional fixing
  • Compressed sheet fixings not installed correctly
  • Sliding door supports not installed
  • Wall framing out of plumb
  • Uncapped waste and sewer pipes left open
Meter box installed out of plumb, Craigieburn
Meter box installed out of plumb
Sample findings

Sample defects found during our frame inspections in Craigieburn

Annotated findings from Frame inspections on Craigieburn builds. Client addresses withheld.

Extra fixing required to floor joists, recorded during a frame inspection in Craigieburn
Floor joists needing additional fixing
Sliding door supports not installed, recorded during a frame inspection in Craigieburn
Sliding door supports not installed
Compressed sheet fixings, recorded during a frame inspection in Craigieburn
Compressed sheet fixings at the balcony
Uncapped sewer pipe, recorded during a frame inspection in Craigieburn
Sewer pipe left uncapped during the build

The other stages of a Craigieburn build

  1. Bored piers inspection in Craigieburn1Bored piersAfter boring and cage placement, before any concrete
  2. Slab pre-pour inspection in Craigieburn2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Lock-up (pre-plaster) inspection in Craigieburn4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  4. Fixing inspection in Craigieburn5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Craigieburn6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Craigieburn7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Craigieburn →

Guides

Construction stage guides for Craigieburn

All guides →

Book a frame inspection in Craigieburn

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Craigieburn: common questions

What is a tie down schedule?

It is the part of your engineering setting out how the roof is held to the walls and the walls to the slab, fixing by fixing, against the wind classification for the lot. A frame inspection reads it and checks the building against it.

Why do uncapped pipes matter at frame stage?

An open waste or sewer point takes in debris and offcuts during the rest of the build, and the blockage is only discovered when something will not drain months later. Capping is a two minute job at this stage.

How much time does the frame stage need on site?

Two to three hours on a single storey, longer on a double storey where the upper frame and its fixings have to be reached safely and photographed.

Will the builder actually fix these?

Most of them, most of the time, because frame items are cheap now and expensive to argue about later. The report gives the supervisor a numbered list with photographs and locations.

Should I book a follow up?

Where the first list was long, it earns its fee back. We reassess frame items at lock-up as a matter of course and record each one as fixed, part done or outstanding.

Do you check services at this stage?

We record what is visible and clearly wrong, such as an uncapped pipe or a point in the wrong position. The detailed services check belongs at lock-up once the rough in is complete.