Craigieburn Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Pre-handover (PCI) inspection in Craigieburn

The full room by room list, taken while the final payment is still yours to withhold.

  • Two to three weeks before your handover date
  • 2 to 3 hours on site
  • Report within 24 hours
Price your Craigieburn inspectionSend the address and what you need.

Fully licensed & accredited

Stage7 of 7
When to bookTwo to three weeks before your handover date
Time on site2 to 3 hours on site
Inspected againstThe VBA Guide to Standards and Tolerances 2015, the NCC, your contract drawings and inclusions

What is included in a Craigieburn pre-handover (PCI) inspection

  • Every room: paint, plaster, cornices, doors, windows and floors
  • Wall and ceiling finish in natural light
  • Wet areas: tiling, grout, silicone, screens and drainage
  • Kitchen and laundry: cabinetry, benchtops and appliances installed
  • External: render, brickwork, cladding, caulking and paint
  • Roof, gutters, downpipes and stormwater connection
  • Roof space where safely accessible
  • Garage door, slab falls and driveway
  • Paths, porch, alfresco and step compliance
  • Site drainage, ponding and slab edge exposure
  • Fencing, gates, letterbox and clothesline where in contract
  • Contract inclusions and selections against what was built
  • Compliance certificates available for waterproofing, termite and glazing
  • A numbered, photographed defect list for the site supervisor
Why it matters here

Pre-handover (PCI) inspections on Craigieburn builds

The Craigieburn handover list keeps landing in three places. Metal roof sheeting that arrived dented and scratched and was never looked at again. Heating and cooling ducts sitting loose or fully disconnected above the ceiling, which shows up later as a room that never warms up. And glazing that is already cracked. All three are straightforward to rectify and all three are far easier to raise before you have paid.

What we find at this stage in Craigieburn

  • Roof sheeting damaged, dented or scratched
  • Heating and cooling ducts loose or disconnected
  • Glazing cracked or damaged
  • Wet area waterproofing not compliant
  • Cladding junctions and capping unsealed
Roof sheeting damage seen from above, Craigieburn
Roof sheeting damage seen from above
Sample findings

Sample defects found during our pre-handover (PCI) inspections in Craigieburn

Annotated findings from Pre-handover (PCI) inspections on Craigieburn builds. Client addresses withheld.

Damaged, scratched or dented roof cladding, recorded during a pre-handover inspection in Craigieburn
Roof sheeting dented and scratched
Heating and cooling duct loose and not connected, recorded during a pre-handover inspection in Craigieburn
Ceiling duct hanging disconnected
Damaged and cracked glazing, recorded during a pre-handover inspection in Craigieburn
Glazing cracked before handover
Additional damaged roof cladding, recorded during a pre-handover inspection in Craigieburn
Further roof damage on the same property

The other stages of a Craigieburn build

  1. Bored piers inspection in Craigieburn1Bored piersAfter boring and cage placement, before any concrete
  2. Slab pre-pour inspection in Craigieburn2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Craigieburn3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Lock-up (pre-plaster) inspection in Craigieburn4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Fixing inspection in Craigieburn5FixingAfter mouldings, doors and joinery, before the painter
  6. Waterproofing inspection in Craigieburn6WaterproofingAfter the membrane is applied and before any tile is laid

All construction stage inspections in Craigieburn →

Guides

Construction stage guides for Craigieburn

All guides →

Book a pre-handover (pci) inspection in Craigieburn

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-handover (PCI) inspections in Craigieburn: common questions

When exactly should I book it?

Two to three weeks before the handover date. Later than that and there is no room for the builder to rectify, which turns the list into a settlement argument instead of a work order.

Do you come back to check the fixes?

Yes. The reinspection marks each item rectified, part done or outstanding, and that document is what you take into the handover meeting.

Why do disconnected ducts matter so much?

Because the symptom appears months later as a room that will not heat, and the cause sits above a finished ceiling where nobody thinks to look. Finding it at handover is the difference between a warranty item and an expensive mystery.

Can I come along?

You are welcome to and many owners do. Two hours on site seeing the items in place is worth more than reading the same list afterwards.

How many items is normal?

Dozens is ordinary on a new build and is not by itself a sign of a bad builder. What matters is the split between structural and cosmetic, which the report sets out.

What if an item gets pushed back on?

Each item cites the clause, tolerance or standard it fails, so the discussion moves onto that document. Where it cannot be resolved, the Victorian route starts with the Building and Plumbing Commission's dispute resolution service.

CallGet a Free Quote